
Sattva Engineering Construction Limited IPO
NSE SMEListed On: Sep 3, 2025 at ₹ 95.10
₹ 240000 /3200 Shares
*Min Investment
26 Aug, 2025
Open Date29 Aug, 2025
Close Date01 Sep, 2025
Allotment Date03 Sep, 2025
Listing DateSattva Engineering Construction IPO Live Subscription Details
View Subscription DetailsSattva Engineering Construction IPO Issue Details
- Issue Price ₹70-75 per equity share
- Face Value ₹10 Per Equity Share
- Total Issue Size 47,16,800 shares(aggregating up to ₹35.38 crore)
- Fresh Share 47,16,800 shares(aggregating up to ₹35.38 crore)
- Listing at NSE SME
- List Price 95.10
- Listing Date 2025-09-03
- Lead Manager Vivro Financial Services Pvt Ltd
- Registrar MUFG Intime India Pvt Ltd
Market Lot Size
Investors can bid for a minimum of 3200 shares and in multiples thereof. The following table depicts the minimum and maximum investment by Individual Investors and HNI in terms of shares and amount.
| Application | Lots | Shares | Amount |
|---|---|---|---|
| Individual (min) | 2 | 3200 | ₹2,40,000 |
| Individual(max) | 2 | 3200 | ₹2,40,000 |
| NII (min) | 3 | 4,800 | ₹3,60,000 |
Sattva Engineering Construction IPO Reservation
Sattva Engineering Construction IPO offers total 33,87,200 shares. Out of which 8,88,000 (NA%) allocated to QIB, 6,91,200 (20.41%) allocated to NII,15,68,000 (46.29%) allocated to RII, NA (NA%) allocated to employees and NA (NA%) allocated to Anchor investors.
| Investor Category | Shares Offered | Maximum Allottees |
|---|---|---|
| Market Maker Shares Offered | 2,40,000 (7.09%) | |
| QIB Shares Offered | 8,88,000 (NA%) | |
| NII (HNI) Shares Offered | 6,91,200 (20.41%) | |
| bNII < ₹10L | 4,60,800 (13.6%) | |
| sNII < ₹10L | 2,30,400 (6.8%) | |
| Individual Shares Offered | 15,68,000 (46.29%) | |
| Total Shares Offered | 33,87,200 (100%) |
Sattva Engineering Construction IPO Details
Sattva Engineering Construction Limited IPO is an SME IPO, priced at ₹70-75 per equity share. The equity shares have a face value of ₹10 Per Equity Share each and will be listed on the NSE SME platform. The IPO comprises a total issue of 47,16,800 equity shares, aggregating up to ₹35.38 crores..
The IPO bidding window is open from Aug 26, 2025 to Aug 29, 2025. The allotment is expected to be finalized on Sep 1, 2025, and the tentative listing date is Sep 3, 2025.
The minimum lot size for Individual investors is 3200 shares, with a minimum investment of ₹2,40,000. For HNIs, the minimum application size is 3 lots , amounting to ₹ 3,60,000.
Vivro Financial Services Pvt Ltd is acting as the lead manager to the issue. The registrar of the IPO is MUFG Intime India Pvt Ltd, and
Sattva Engineering Construction IPO Subscription Analysis And Details
| As on | QIB / NII | Individual | Total |
|---|---|---|---|
| Shares Offered / Reserved | 8,88,000 / 6,91,200 | 15,68,000 | 31,47,200 |
Day 1 26-08-25 06:00 PM | 0.00 / 2.00 x | 1.95 x | 1.41 x |
Day 2 28-08-25 06:00 PM | 0.02 / 7.72 x | 8.82 x | 6.10 x |
Day 3 29-08-25 06:00 PM | 123.39 / 351.82 x | 172.18 x | 197.87 x |
Sattva Engineering Construction Valuations
Sattva Engineering Construction Company Financials
| 31-Mar-25 | 31-Mar-24 | 31-Mar-23 | |
|---|---|---|---|
| Assets | 114.82 | 87.48 | 83.38 |
| Revenue | 94.85 | 77.44 | 83.93 |
| Profit After Tax | 9.14 | 4.56 | 1.04 |
| Net Worth | 43.42 | 24.03 | 19.47 |
| Reserves & Surplus | 30.67 | 23.03 | 18.47 |
| Total Borrowing | 36.17 | 32.20 | 32.24 |
About Sattva Engineering Construction Company
Founded in December 2005, Sattva Engineering Construction Limited is an EPC company based in Chennai focusing on water infrastructure, wastewater, and industrial construction works.With a rich history of more than 40 years, SECL is a top-class Class I contractor partnering with government organizations such as the Tamil Nadu Public Works Department and Chennai Metropolitan Water Supply and Sewerage Board.
SECL provides integrated EPC services for a number of industries:
Water and Sewerage Projects: Development of water distribution networks, pumping mains, overhead and underground storage tanks, water and sewage treatment plants, and pumping stations.
Industrial and Civil Infrastructure Development: Construction of factory complexes, warehouses, container freight stations, and commercial buildings.
Residential Development: Design and marketing of multi-storeyed residential flats, luxury apartments, residential flats, and standalone bungalows, promoting urban infrastructure in the region.
Prominent clients are CMWSSB, TWAD, PWD, Greater Chennai Corporation, Southern Railway, and BHEL
Sattva Engineering Construction - Promoter(s)
Santhanam Seshadri
R Sekar
Jagachchandarr Sekar Uthra
Pre Issue Share Holding : 86.18%
Post Issue Share Holding : %
Sattva Engineering Construction IPO - Issue Objectives
To meet long-term working capital requirements
General Corporate Purposes
Contact Details
Sattva Engineering Construction
Greams Dugar, 4th floor, North Wing, Old No. 149, New No . 64, Greams Road Thousand Lights Chennai, Tamil Nadu, 600006
+91-80 1555 6979
Registrar Contact Details
MUFG Intime India Private Limited (Link Intime)
+91-22-4918 6270
Sattva Engineering Construction IPO - FAQs
Ans. Sattva Engineering Construction Limited IPO is a SME IPO. The issue is priced at ₹70-75 per equity share. The minimum order quantity is 1600 Shares. The IPO opens on Aug 26, 2025, and closes on Aug 29, 2025. MUFG Intime India Pvt Ltd is the registrar for the IPO. The shares are proposed to be listed on NSE SME.
Ans. The Sattva Engineering Construction Limited IPO opens on Aug 26, 2025 and closes on Aug 29, 2025.
Ans. You can track the real-time subscription numbers using the links below:
Ans. The size of Sattva Engineering Construction Limited IPO is 47,16,800 shares(aggregating up to ₹35.38 Cr).
Ans. The Sattva Engineering Construction Limited IPO price band is set between ₹70-75 per equity share.
Ans. To apply for Sattva Engineering Construction Limited IPO, follow the steps given below:
- - Open the IPO Ji App or Website
- - Find Sattva Engineering Construction Limited IPO in the List of IPOs
- - Press Apply Button
- - Select Your Demat Account
- - Select Your Shares Quantity and Submit
- - Track Your IPO Status
Ans. The share allotment date of Sattva Engineering Construction Limited IPO is Sep 1, 2025.
Ans. The Sattva Engineering Construction Limited IPO will be listed on Sep 3, 2025.
Ans. Follow the steps to check the Sattva Engineering Construction Limited IPO allotment status online.